How to pull material
1
Open the job
Go to the job detail page and click Pull Material.
2
Pre-fill from a template or assignment (optional)
Choose a Template or an Assigned Material from the dropdown to pre-fill the lines.
3
Select location, material, and quantity
Select the location, the material, and enter the quantity you are pulling.
4
Add more lines if needed
Click + to add more material lines.
5
Submit the pull
Click Pull Material to submit. The stock count drops and the cost is added to the job.
Pulling when stock shows zero (negative inventory)
You can still pull material when the system shows zero on hand. The crew has the material in front of them, so the movement must be recorded.1
Enter a positive quantity
Enter the quantity you are pulling as a positive number. Never type a negative quantity.
2
Submit the pull as normal
Click Pull Material. The stock count for that item will go negative.
3
Notify your production manager
Tell your production manager that a negative pull occurred so it can be corrected at the next restock or physical audit.